Products
Contact Us
- Contact Person : Mr. Leo Yan
- Company Name : Laizhou Chengda Machinery Co.,LTD
- Tel : 86-0535-2217713
- Fax : 86-0535-2258713
- Address : shandong,laizhou,Laizhou sanlihezi Industrial Park
- Country/Region : China
- Zip : 261400
Pellet Cooler
Product Detailed
Related Categories:Agricultural Product Stock
Equipped with professional pellet cooler factory,Website:http://www.pelletmachinechengda.com, Laizhou Chengda Machinery Co.,Ltd is one of the leading China sawdust pellet cooler, wood cooling machine, animal feed pellet cooler, feed cooling machine manufacturers.Pellet Cooler,Why we need pellet cooler?Biomass pellets or briquettes from pellet machine are with high moisture content above 16% and high temperature degree about 70-85°C, therefore cooler is necessary to low down material temperature to 3-5°C higher than room temperature and for safely stored or transported in case the mildew.Model No.: LQJ300 Model No.: LQJ350Assort Generator: Y100L1-4 Assort Generator: Y100L1-4Motor Power:1.5kw Motor Power: 1.5kwDraught fan:5.5+1.5 Draught fan: 7.5+1.5Capacity:1000-2000kg/h Capacity: 2000-3000kg/hPacking Size: 206*210*384 (cm) Packing Size: 216*220*424(cm)Pellet Cooling Machine Features 1.Large cooling room and cooling capacity from 5-30t/h. 2. Countercurrent cooling principle, reasonable design and good cooling effect. 3. Cold air enters from the bottom ensures high cold air efficiency. 4. Unique rotating structure to distribute pellets evenly and cool them completely. 5. Suitable to cool bulk, platy or particles materials, especially to puffing materials and other large volume material.Operation and maintain on Combined Cooler and Sieve as follows:1. The Combined Cooler and Sieve only can start under the situation without any loading. In another word, the operator must guarantee without any material. Only after the Combined Cooler and Sieve start for a while, the material can be feeding.2. When feeding material into Combined Cooler and Sieve, the speed must be slow till to the rated capacity gradually, the feeding must be evenly. Otherwise the material will be clogged and damage the machine.3. In order to guarantee the starting of Combined Cooler and Sieve without any loading, before the Combined Cooler and Sieve stops work, all the material inside the Combined Cooler and Sieve must be discharged completely without any resting.4. Please prohibit any big material inletting the Combined Cooler and Sieve mixing with the small material. For the big material will be clogged and damage the machine.5. Please check each part of Combined Cooler and Sieve before starting the machine, especially whether the fixing parts are loosing. All the fixing parts must be fastened well.6. Please pay more attention on the screw between the Combined Cooler and Sieve and Connecting Shaft, once checking it is loosen, stop the machine urgently and fasten it.7. Don’t take off the cover of Combined Cooler and Sieve avoiding hurting the operators.8. When the Combined Cooler and Sieve has any problem, please check and solve it, surely don’t run the machine under the abnormal situation.9. Please lubricate the Combined Cooler and Sieve often. The reducer must be lubricated according to the operation manual. The front and back bearing boxes of Combined Cooler and Sieve must be lubricated by lithium grease with adding about 5g each 15 days.
Other products